West Hendon Broadway development aerial view showing the waterside location and architectural design

Highway Works

Comprehensive highway improvements supporting the West Hendon masterplan, designed to enhance traffic flow, improve pedestrian access, and create better public spaces.

Highway Works Overview

The highway scheme is designed to achieve key improvements to traffic flow while supporting the wider regeneration of West Hendon.

Traffic Flow Improvements

  • Removal of the gyratory system of Perryfield Way, reducing traffic circulation on residential streets
  • Make Station Road two way between West Hendon Broadway and Wilberforce Road
  • Allow traffic to turn right from West Hendon Broadway into Station Road
  • Change direction of traffic flow on Wilberforce Road and Herbert Road to discourage through traffic

Public Realm Enhancements

  • Improve pedestrian and cycle crossing facilities
  • Improve the public realm with new trees and lighting
  • Enhanced street furniture and public art installations
  • New bus shelters and cycle stands

Scheme Plan

Overview of the highway works layout and key changes across the West Hendon Broadway area.

Official Highway Works Plan

Detailed scheme layout from consultation boards

Official highway works

This plan shows the complete highway works scheme including traffic signal upgrades, road widening, pedestrian crossings, bus stop relocations, and the new traffic flow arrangements.

Infrastructure Improvements

Comprehensive upgrades to traffic management systems and road infrastructure.

Traffic Signal Upgrades

  • • Upgraded traffic lights at Station Road and Cool Oak Lane junctions
  • • Removal of traffic lights at Perryfield Way and Herbert Road junction
  • • New traffic lights at Ravenstone Road

Pedestrian & Cycle Facilities

  • • New pedestrian/cycle crossing over West Hendon Broadway at Stanley Road
  • • Enhanced pedestrian crossings at key junctions
  • • Improved cycle facilities and stands

Road Infrastructure

  • • New carriageway and footway surfacing
  • • Upgraded drainage systems
  • • Enhanced street lighting
  • • Public art installations

Upcoming Changes

Major traffic changes and next phases of the highway works program.

July 2025Traffic Switch

The new traffic lights will be switched on and the new Station Road junction will open

Major traffic reconfiguration marking is required to achieve the new permanent junction arrangements.

  • • Two way traffic will be allowed on Station Road
  • • Traffic directions will be reversed on Wilberforce Road and Herbert Road
  • • Perryfield Way will be permanently closed to through traffic
  • • Existing traffic lights at exit of Perryfield Way (Herbert Road) will be removed
Stage 2July 2025 to early 2026

Complete the remaining highway improvement works along West Hendon Broadway

Once the traffic switch has taken place and the new Station Road junction is operational, the remaining of the planned footway and carriageway works along West Hendon Broadway (north and south of Perryfield Way) will commence.

  • • A phased traffic management approach using alternating lane closures will be used to facilitate progress
  • • Final carriageway resurfacing (at completion of the works) will be undertaken during night time hours to minimise disruption

Scheme Statistics

Key figures showing the scale of improvements being delivered.

9,455 sq.m
Carriageway Resurfacing
Road surface improvements
1,440 sq.m
New Carriageway Widening
Enhanced road capacity
5,340 sq.m
Upgraded Footways
Improved pedestrian areas
Enhanced
Street Infrastructure
Lighting, trees & access

Questions About Highway Works?

Our team is available to discuss any aspects of the highway works and how they might affect you or your business.