
Project Background
The masterplan is a collaborative effort led by Barratt London, in partnership with Barnet Council and other stakeholders. With a focus on creating mixed-tenure housing and public amenities, the project addresses the needs of the local community while enhancing the area's appeal.
Origins of the Masterplan
Understanding how the West Hendon Broadway came to life and the collaborative partnership that drives its success.
A Collaborative Vision
The West Hendon Broadway emerged from a shared commitment between public and private sectors to transform an underutilized area into a thriving community. This collaboration brings together the expertise and resources needed to deliver a project of this scale and ambition.
The unique peninsula location, surrounded by the Welsh Harp Reservoir, presented both opportunities and challenges that required innovative solutions and careful planning to realize the area's full potential.
By focusing on mixed-tenure housing and comprehensive public amenities, the project addresses the real needs of the local community while creating new opportunities for residents and businesses.
Project Foundation
Development Context
The West Hendon area and the factors that shaped our approach to regeneration.
Unique Location
The West Hendon estate occupies a distinctive peninsula location surrounded by the Welsh Harp Reservoir, offering exceptional natural surroundings within London.
- • Waterside setting with reservoir views
- • Previously isolated from surrounding areas
- • Significant regeneration potential
Housing Requirements
The local area had significant housing needs that required a comprehensive approach to provide quality homes across different tenure types and price points.
- • Need for modern, energy-efficient homes
- • Mixed-tenure housing requirements
- • Replacing outdated housing stock
Infrastructure Needs
The existing infrastructure required significant improvements to support a modern community and better connect the area with surrounding neighborhoods.
- • Transport and connectivity improvements
- • Utility system upgrades
- • Enhanced public spaces
Our Approach
How we've designed the project to address community needs while enhancing the area's natural and built environment.
Community-Centered Design
From the outset, the project has been designed around the needs and aspirations of the local community. This approach ensures that the development serves existing residents while welcoming new families to the area.
Mixed-Tenure Housing
Providing homes for different income levels and housing needs, promoting social integration and community cohesion.
Public Amenities
Creating community centers, parks, and commercial spaces that serve the daily needs of residents and local businesses.
Environmental Responsibility
The unique waterside location requires careful environmental stewardship. Our approach balances development needs with protection of the Welsh Harp Reservoir and surrounding natural areas.
Sustainable Development
Implementing energy-efficient building standards, sustainable drainage systems, and green building practices throughout the development.
Natural Environment
Protecting and enhancing the reservoir environment while creating new green spaces and recreational opportunities for residents.
Connectivity and Integration
A key goal of the masterplan is to reconnect the previously isolated site with surrounding streets and neighborhoods, improving access and integration with the wider area.
Transport Links
Major improvements to road networks, public transport access, and pedestrian and cycling connections throughout the area.
Social Integration
Creating spaces and opportunities that bring together existing and new residents, fostering community relationships and shared experiences.
Learn More About Our Partners
Discover the organizations and teams working together to bring the West Hendon Broadway to life.