West Hendon Broadway road works and traffic management

Traffic Management

Information about traffic changes, road closures, and management measures during the highway works to minimize disruption to residents and businesses.

Current Traffic Changes

Active traffic management measures and current road conditions.

Active Traffic Management

We are currently in Stage 1 of the highway works with the following active measures:

  • Temporary traffic lights at Station Road junction (high-tech systems connected to area traffic lights)
  • Station Road widening works in progress with lane restrictions
  • Occasional temporary footway diversions during construction

Upcoming Traffic Changes

Major traffic changes scheduled for July 2025 and beyond.

Traffic Switch - July 2025

Major Changes
  • New traffic lights at Station Road switched on
  • Station Road opens to two-way traffic
  • Traffic direction reversed on Wilberforce Road and Herbert Road
  • Perryfield Way permanently closed to through traffic

Stage 2 - July 2025 to Early 2026

Final Works
  • West Hendon Broadway improvements between Cool Oak Lane and Garrick Road
  • Alternating lane closures to facilitate progress
  • Night-time carriageway resurfacing towards program end

Minimizing Disruption

Our comprehensive approach to reducing impact on the local community during construction works.

Advanced Communication

  • • Advanced warnings of significant disruptions
  • • Regular updates via website and community notices
  • • Direct communication with affected residents and businesses

Maintained Access

  • • Maintain access for residents and businesses wherever possible
  • • Alternative routes provided when necessary
  • • Emergency access always maintained

Careful Timing

  • • Phased approach ensures minimal impact
  • • Night work only when absolutely necessary
  • • Coordination with local events and peak times

Alternative Routes

Recommended alternative routes during construction and after Perryfield Way closure.

Current Diversions

During ongoing construction works, temporary diversions may be in place:

  • • Follow signed diversion routes around active work areas
  • • Allow extra time for journeys during peak construction periods
  • • Check for updates before traveling

Post-Closure Routes

After Perryfield Way closure (July 2025), detailed alternative route maps will be provided:

  • • New two-way access via Station Road
  • • Updated traffic flow on Wilberforce Road and Herbert Road
  • • Comprehensive signage and wayfinding

Stay Informed

Get the latest traffic updates and report any issues during the works.

Email Updates

Contact us for traffic-related questions or to report issues

Email Traffic Team

Emergency Issues

For urgent traffic or safety concerns during works

Report Emergency