West Hendon Broadway development aerial view showing the waterside location and architectural design

Highway Works Key Improvements

Detailed breakdown of the highway improvements being delivered to support the West Hendon masterplan and improve traffic flow in the local area.

Scheme Plan

Overview of the highway works layout and key changes across the West Hendon Broadway area.

Official Highway Works Plan

Detailed scheme layout from consultation boards

This plan shows the complete highway works scheme including traffic signal upgrades, road widening, pedestrian crossings, bus stop relocations, and the new traffic flow arrangements.

Primary Objectives

The highway scheme is designed to achieve key improvements to traffic flow and accessibility.

Traffic Flow Improvements

  • Removal of the gyratory system of Perryfield Way, reducing traffic circulation on residential streets
  • Make Station Road two way between West Hendon Broadway and Wilberforce Road
  • Allow traffic to turn right from West Hendon Broadway into Station Road
  • Change direction of traffic flow on Wilberforce Road and Herbert Road to discourage through traffic

Public Realm Enhancements

  • Improve pedestrian and cycle crossing facilities
  • Improve the public realm with new trees and lighting
  • Enhanced street furniture and public art installations
  • New bus shelters and cycle stands

Infrastructure Improvements

Comprehensive upgrades to traffic management systems and road infrastructure.

Traffic Signal Upgrades

  • • Upgraded traffic lights at Station Road and Cool Oak Lane junctions
  • • Removal of traffic lights at Perryfield Way and Herbert Road junction
  • • New traffic lights at Ravenstone Road

Pedestrian & Cycle Facilities

  • • New pedestrian/cycle crossing over West Hendon Broadway at Stanley Road
  • • Enhanced pedestrian crossings at key junctions
  • • Improved cycle facilities and stands

Road Infrastructure

  • • New carriageway and footway surfacing
  • • Upgraded drainage systems
  • • Enhanced street lighting
  • • Public art installations

Scheme Statistics

Key figures showing the scale of improvements being delivered.

9,455 sq.m
Resurfaced Carriageway
Road surface improvements
1,440 sq.m
Widened Carriageway
Enhanced road capacity
5,340 sq.m
Upgraded Footways
Improved pedestrian areas
Enhanced
Street Infrastructure
Lighting, trees & access

Learn More

Explore other aspects of the highway works and stay informed about progress.